Cactus II pipeline capacity fully committed with shipping contracts

March 1, 2018
barronadler

Plains All American Pipeline announced this week that its Cactus II pipeline, which runs from the Permian Basin to Corpus Christi, is fully committed with long term shipping contracts.  The pipeline’s initial capacity is 525,000 barrels-per-day.

Link: https://dailyenergyinsider.com/news/10938-cactus-ii-pipeline-capacity-fully-committed-long-term-third-party-shipper-contracts