Call Us Today: Austin: 512.478.4995 | Houston: 713.526.1500
PROTECTING LANDOWNER RIGHTS THROUGHOUT TEXAS... AND BEYOND
PROTECTING LANDOWNER RIGHTS THROUGHOUT TEXAS... AND BEYOND
Innovative Strategy, Dedicated Advocacy, Proven Results
February 14, 2018 Posted in Articles Share
A new 520-mile natural gas pipeline project is currently in an open season for new shipping contracts. The Permian to Katy Pipeline, a Sempra LNG & Boardwalk Pipeline Partners jointly developed project, would have a capacity of 1.7Bcfd to 2.25Bcfd. The pipeline would be 36” for most of its length, but increase to 42” inches near its terminus. The project is estimated to be in-service in the third quarter of 2020.
Austin
Barron, Adler, Clough & Oddo, LLP
808 Nueces Street
Austin, TX 78701
Phone: 512-478-4995
Fax: 512-478-6022
Houston
Barron, Adler, Clough & Oddo, LLP
801 Congress Avenue Suite 350
Houston, TX 77002
Phone: 713-526-1500
Fax: 713-526-1550
*By appointment only