Call Us Today: Austin: 512.478.4995 | Houston: 713.526.1500
PROTECTING LANDOWNER RIGHTS THROUGHOUT TEXAS... AND BEYOND
PROTECTING LANDOWNER RIGHTS THROUGHOUT TEXAS... AND BEYOND
Innovative Strategy, Dedicated Advocacy, Proven Results
June 27, 2018 Posted in Articles Share
Kinder Morgan has announced plans to construct a gas pipeline connecting the Permian Basin to Houston, Corpus Christi, and hubs in Mexico. The 430 mile pipeline, dubbed the Permian Highway Pipeline, will be a joint venture between Kinder Morgan and Midland-based EagleClaw Midstream and is expected to cost $2 billion to construct. The pipeline is expected to be in operation by 2020.
Link: https://www.chron.com/business/article/Kinder-Morgan-s-2B-pipeline-to-move-gas-from-13025312.php
Austin
Barron, Adler, Clough & Oddo, LLP
808 Nueces Street
Austin, TX 78701
Phone: 512-478-4995
Fax: 512-478-6022
Houston
Barron, Adler, Clough & Oddo, LLP
801 Congress Avenue Suite 350
Houston, TX 77002
Phone: 713-526-1500
Fax: 713-526-1550
*By appointment only